DELL POWEREDGE R730 SERVERS Optimize and accelerate your workloads. Simplify and automate your IT management tasks Mana...

Windows 2012 installation on Dell poweredge r730 from Idrac8 / lifecycle controller









DELL POWEREDGE R730 SERVERS
Optimize and accelerate your workloads.

Simplify and automate your IT management tasks

Manage your data center servers the way you want: individually, collectively, in-person, remotely or with your smartphone — it’s your choice. Consistent administration and 3rd-party integration ensure seamless management of PowerEdge servers.
Simplify administration
Simplify administration of PowerEdge servers with the embedded intelligence of the integrated Dell Remote Access Controller (iDRAC) with Lifecycle Controller and with the robust, timesaving management features of the entire Dell OpenManage portfolio.
Agent-free management
Agent-free management from iDRAC8 with Lifecycle Controller offers real-time monitoring for the server and internal storage devices. It also monitors server health, multiple internal parameters and system performance without requiring agents to be installed in the server operating system — agents which could require additional upkeep and consume valuable CPU time.
Zero-touch automated deployment
Zero-touch automated deployment discovers and auto-configures Dell servers by using configuration files stored in designated locations on an internal network, which can reduce setup time and manual entry errors. Administrators can simply rack, cable and walk away.
Automated server updates
Automated server updates synchronize servers to firmware baselines stored at designated locations on an internal network to simplify firmware updates.
The Tech Support Report
The Tech Support Report, automatically maintained by iDRAC, is a continuously updated health and status report that monitors over 5,000 key system parameters and can help cut time needed to identify and resolve server issues.

Accelerate IT service deployment

Streamline infrastructure provisioning, speed up workload deployment and simplify IT service delivery through the unified console and highly intuitive user interface of Active System Manager. Enhanced for the latest generation of PowerEdge servers, it features: 
  • Template-based server and IO configurations, identity management and service migration capabilities
  • Fast workload deployment with an expanding out-of-box template library
  • Cloud enablement with support for infrastructure as a service (IaaS) and platform as a service (PaaS), including Red Hat and VMware solutions

Follow below steps or click the below link to watch video 




Installation steps:

  • Connect to Idrac
  • Press F10 for lifecycle controller
  • Goto OS deployment
  • Click deploy OS
  • Choose configure RAID first 
  • Choose the RAID controller
  • Select the RAID level (in my example i use raid 1 with 2 hdd and 1 hdd as hotspare)
  • Select the disks
  • Enter Virtual disk name and leave it default
  • confirm and finish 
  • click yes on confirmation
  • RAID is configured
  • Choose UEFI and choose windows 2012 R2
  • select manual installation 
  • Insert Win 2012 media
  • Click Finish 
  • choose language, insert your license key 
  • Select Win 2012 standard GUI
  • Accept agreement
  • Select Custom install
  • Select the disk and click next
  • Wait for installation to complete
  • Enter new password 
  • Done

SUBSCRIBE @ https://goo.gl/p1WUtz
Website @ www.adelbaloshi.com
ADD ME ON FB @ https://www.facebook.com/adelm696
ADD ME ON TSU @ http://www.tsu.co/adilm696
ADD ME ON INSTA @ https://www.instagram.com/adilmohd_696/
ADD ME ON SNAP @ adilm696
Skype @ adilmohd_696

0 comments: